Project 12
 Build a switch operated HO scale Target Signal
 This project involves the construction of a simple target searchlight type signal system operated manually by a double pole switch. This signal system is made using a single,  two lead, bicolor LED Red and Green.

The same signal can be operated automatically using a microcontroller along with a train occupancy detection system. (a future project)